4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power

Negotiated
Price
4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power
Features Gallery Product Description Request A Quote
Features
Specifications
Product Name: Diesel Engine Assembly
Excavator Model: SY75 - 8
Engine Model: 4JG1
Condtion: New
Power: 48.5 Kw
Type: Diesel Engine
Color: Same As Pictures
Material: Steel
High Light:

Diesel Engine Assembly 48.5kw

,

SY75-8 Diesel Engine Assembly

,

ISUZU 4JG1 Engine Diesel

Basic Infomation
Place of Origin: Japan
Brand Name: ISUZU
Model Number: 4JG1
Payment & Shipping Terms
Packaging Details: Neutral Package or Fumigation Free
Delivery Time: 5 - 8 work days
Payment Terms: D/P, T/T
Supply Ability: 3 pieces
Product Description

 

 

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75 - 8 Water Cooling

 

 

Specification

 

Car name: Complete Engine
Model Number: 4TNV98
Cylinder stroke: 107
Application: Excavator
Cylinder diameter: 95. 4
valve: 8 valve
Cooling: Water cooling
Output: 48.5kw
Injection: Direction
Cylinders of number: 4

 


Description

What is an engine assembly?
A cylinder block assembly and head assembly are described for use in an internal-combustion engine. They include: a closed-deck, cylinder block with a deck and first fluid chamber; and a cylinderhead disposed on the deck having a second fluid compartment; and a gasket interposed between the cylinder blocks and the cylinder heads.

 

How long does it take for a motor to be installed?
The shop time for a typical engine will be between 10 and 12 hours. A simple engine with a skilled mechanic may be quoted in as little as 8 to 12 hours. Larger jobs may take up to 15 hours.

 

How can I find out if I have an engine bloc?
A cracked engine block can be characterized by overheating, blue or gray smoke coming from the underside of the hood, and poor performance. Most often, the problem is caused by excessive heat due to low coolant, extreme temperature, or overburdening. You risk bursting a head gasket if you don’t resolve the problem quickly.

 

How long does it take for an engine to be installed in a car?
A typical engine will take between 10 and 12 hours to repair. A simple engine with a skilled mechanic may be quoted in as little as 8 to 12 hours. Larger jobs may take up to 15 hours. The majority of quotes should be given within the first hour.

 

How long does it take for a car engine to be put back together again?
Two weeks

 

How long does it take to put together an engine?
On average, we are 30 to 45 days behind. It takes 35 to 40 to build an engine (by the time parts get in, machining gets completed, all hand fittings, etc.).You can expect to be waiting between 70 and 90 days from start-to-finish.

 

4JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power 04JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power 14JG1 ISUZU Diesel Engine Assembly For Excavator SY75-8 48.5kw Power 2

Recommended Products
Get in touch with us
Tel : 15112670997
Fax : 86--15112670997
Characters Remaining(20/3000)